One way to solve this problem is to make the building flat.
The ideal solution is that two shuttle service elevators go directly from the underground to the lobby, and the other four service elevators run from the air lobby to the roof of the guest room. The service floor of the podium elevator is small, and the flow can be diverted by setting up a sufficient number of escalators (the escalator carrying capacity can reach 9,000 people/hour) without too much discussion.
Principles of elevator configuration: estimate the number of users of the building, determine the 5-minute carrying capacity requirements, and determine the escalator waiting time requirements.
The first thing that needs to be considered is the determination of the distribution and transformation system and the emergency power supply system and the access of the self-prepared power supply system, including supplyThe establishment of the electric voltage level, the establishment of a normal power supply system, the selection of self-provided emergency power supply system equipment, and the reasonable and effective connection of the self-provided emergency power supply system to the main system need to be paid attention to.
Elevator; 4 elevators should be installed when 40 people live on each floor and the number of floors is more than 35. In the preliminary design and construction drawing design stage, the number of elevators should be calculated and determined. The service quality of the elevator should meet the following requirements: the average waiting time of passengers should not exceed 120 seconds, and the interval between elevators should not exceed 60 seconds.
Door system: The main function of the door system is to seal the entrance of the floor station and the entrance of the carriage. Weight balancing system: The main function of the system is to relatively balance the weight of the car. In the elevator work, the weight difference between the car and the counterweight can be kept within the limit to ensure the normal towing transmission of the elevator.
1. Figure 2-1 PLC Elevator Linkage Control System Unified hardware block diagram. It can be seen from Figure 3-1 that the system mainly consists of two parts, of which the logical part of elevator control is implemented by PLC. Through analysis and research on elevatorsThe actual operation situation and control laws, so as to design and develop the elevator linkage control program, so that the PLC can control the operation of the elevator.
2. The comfort of elevator operation has been improved, so that the elevator has achieved a relatively ideal control effect. Compared with traditional elevators, the elevator designed in this article has a good sense of comfort in operation, can save electricity in life, achieve good economic and social benefits, and achieve the ideal purpose.
3. The technical indicators you mentioned are the main indicators of the country that the elevator system follows now, or is your research method actually to use PLC control to realize the only control of the elevator! You need to search for other specific content on the Internet. There should be a lot of this.
It mainly involves the overall design scheme, composition and modular program design of the PLC control system of the five-story elevator.
. Draw the PLC terminal wiring diagram and control ladder diagram according to the requirements of the question. Two. Complete the PLC terminal wiring work, and use the programmer to input the ladder diagram control program to complete the debugging. Complete the course design instructions. Defense questions: 1. Clarify the idea of program design and workflow.
Design requirements I/O allocation on the basis of understanding the process. Carry out the software design of the PLC control system and draw functional diagrams, ladder diagrams and circuit diagrams. Design and draw process drawings, specifically including electrical panel layout drawings and wiring diagrams.
Hardware design of elevator 1 Hardware configuration of elevator control system This system is an AC variable frequency conversion speed control system mainly composed of PLC, frequency converter, control box, display and drag motor (Variable Voltage Variable Frequenc Y, abbreviated as VVVF).
The elevator control system is mainly composed of speed regulation part and logical control part. The performance of the speed control part plays an important role in the comfort of passengers during elevator operation. At present, most of them use high-performance frequency converters to measure the speed of the induction motor using rotary encoders to form a closed-loop vector control system.
The hardware structure diagram of the hardware structure system is shown in Figure 1.PLC is Siemens' S7-200 series CPU221. PLC receives the summoning signal from the control plate and each layer of the elevator box, the functional signal of the car and door system, and the status signal of the shaft and frequency converter, and realizes the selective control of the elevator through program judgment and calculation.
Software: step7 Hardware: Siemens 300, 400 series Components: self-reset button start, stop switch, corresponding to I0.0, I0.1 respectively; motor start output Q0.0; use S_ODTS timer, start delay 5S, stop delay 10S.
PLC is Siemens' S7-200 series CPU221. The PLC receives the call signal from the control plate and each layer of the elevator box, the functional signal of the car and door system, and the status signal of the shaft and frequency converter, and realizes the selection control of the elevator through program judgment and calculation.
*Global trade data for currency hedging-APP, download it now, new users will receive a novice gift pack.
One way to solve this problem is to make the building flat.
The ideal solution is that two shuttle service elevators go directly from the underground to the lobby, and the other four service elevators run from the air lobby to the roof of the guest room. The service floor of the podium elevator is small, and the flow can be diverted by setting up a sufficient number of escalators (the escalator carrying capacity can reach 9,000 people/hour) without too much discussion.
Principles of elevator configuration: estimate the number of users of the building, determine the 5-minute carrying capacity requirements, and determine the escalator waiting time requirements.
The first thing that needs to be considered is the determination of the distribution and transformation system and the emergency power supply system and the access of the self-prepared power supply system, including supplyThe establishment of the electric voltage level, the establishment of a normal power supply system, the selection of self-provided emergency power supply system equipment, and the reasonable and effective connection of the self-provided emergency power supply system to the main system need to be paid attention to.
Elevator; 4 elevators should be installed when 40 people live on each floor and the number of floors is more than 35. In the preliminary design and construction drawing design stage, the number of elevators should be calculated and determined. The service quality of the elevator should meet the following requirements: the average waiting time of passengers should not exceed 120 seconds, and the interval between elevators should not exceed 60 seconds.
Door system: The main function of the door system is to seal the entrance of the floor station and the entrance of the carriage. Weight balancing system: The main function of the system is to relatively balance the weight of the car. In the elevator work, the weight difference between the car and the counterweight can be kept within the limit to ensure the normal towing transmission of the elevator.
1. Figure 2-1 PLC Elevator Linkage Control System Unified hardware block diagram. It can be seen from Figure 3-1 that the system mainly consists of two parts, of which the logical part of elevator control is implemented by PLC. Through analysis and research on elevatorsThe actual operation situation and control laws, so as to design and develop the elevator linkage control program, so that the PLC can control the operation of the elevator.
2. The comfort of elevator operation has been improved, so that the elevator has achieved a relatively ideal control effect. Compared with traditional elevators, the elevator designed in this article has a good sense of comfort in operation, can save electricity in life, achieve good economic and social benefits, and achieve the ideal purpose.
3. The technical indicators you mentioned are the main indicators of the country that the elevator system follows now, or is your research method actually to use PLC control to realize the only control of the elevator! You need to search for other specific content on the Internet. There should be a lot of this.
It mainly involves the overall design scheme, composition and modular program design of the PLC control system of the five-story elevator.
. Draw the PLC terminal wiring diagram and control ladder diagram according to the requirements of the question. Two. Complete the PLC terminal wiring work, and use the programmer to input the ladder diagram control program to complete the debugging. Complete the course design instructions. Defense questions: 1. Clarify the idea of program design and workflow.
Design requirements I/O allocation on the basis of understanding the process. Carry out the software design of the PLC control system and draw functional diagrams, ladder diagrams and circuit diagrams. Design and draw process drawings, specifically including electrical panel layout drawings and wiring diagrams.
Hardware design of elevator 1 Hardware configuration of elevator control system This system is an AC variable frequency conversion speed control system mainly composed of PLC, frequency converter, control box, display and drag motor (Variable Voltage Variable Frequenc Y, abbreviated as VVVF).
The elevator control system is mainly composed of speed regulation part and logical control part. The performance of the speed control part plays an important role in the comfort of passengers during elevator operation. At present, most of them use high-performance frequency converters to measure the speed of the induction motor using rotary encoders to form a closed-loop vector control system.
The hardware structure diagram of the hardware structure system is shown in Figure 1.PLC is Siemens' S7-200 series CPU221. PLC receives the summoning signal from the control plate and each layer of the elevator box, the functional signal of the car and door system, and the status signal of the shaft and frequency converter, and realizes the selective control of the elevator through program judgment and calculation.
Software: step7 Hardware: Siemens 300, 400 series Components: self-reset button start, stop switch, corresponding to I0.0, I0.1 respectively; motor start output Q0.0; use S_ODTS timer, start delay 5S, stop delay 10S.
PLC is Siemens' S7-200 series CPU221. The PLC receives the call signal from the control plate and each layer of the elevator box, the functional signal of the car and door system, and the status signal of the shaft and frequency converter, and realizes the selection control of the elevator through program judgment and calculation.
*How to analyze customs transaction records
author: 2024-12-24 00:07Processed fruits HS code insights
author: 2024-12-23 23:56How to simplify HS code selection
author: 2024-12-23 22:55Mineral fuels HS code data analysis
author: 2024-12-24 01:09Global trade analysis dashboard
author: 2024-12-24 00:18Real-time HS code duty updates
author: 2024-12-24 00:05Advanced commodity classification analytics
author: 2024-12-23 23:05How to find authorized economic operators
author: 2024-12-23 22:53743.97MB
Check737.83MB
Check544.14MB
Check827.86MB
Check741.57MB
Check164.32MB
Check231.62MB
Check761.98MB
Check194.12MB
Check764.37MB
Check371.61MB
Check849.54MB
Check479.23MB
Check953.89MB
Check134.84MB
Check363.39MB
Check197.71MB
Check934.89MB
Check768.59MB
Check964.51MB
Check851.69MB
Check376.64MB
Check879.73MB
Check169.52MB
Check567.56MB
Check853.54MB
Check268.89MB
Check942.72MB
Check314.33MB
Check757.77MB
Check621.66MB
Check624.91MB
Check655.88MB
Check524.61MB
Check693.34MB
Check861.75MB
CheckScan to install
Global trade data for currency hedging to discover more
Netizen comments More
558 HS code reference for mineral exports
2024-12-24 01:26 recommend
2756 How to optimize packaging with trade data
2024-12-24 01:19 recommend
1109 customs data reports
2024-12-24 00:24 recommend
501 How to integrate trade data with RPA
2024-12-23 23:42 recommend
1896 Trade data for transshipment analysis
2024-12-23 22:51 recommend